Dear Priya
Four terms in the redlined SOW override the master, and two introduce obligations the master does not contain.
The acceptance window at SOW section 5 is cut from 30 days to 10, against MSA clause 6.2, which sets 30 and does not permit a shorter period in an SOW. Section 8 adds liquidated damages of 2 percent per week of delay; the MSA at 14.3 excludes liquidated damages unless agreed in a signed amendment, which an SOW is not. Section 9 names three individuals as key personnel who may not be replaced without consent, where MSA 7.4 permits replacement with equivalent staff on notice. Section 11 states that the SOW prevails over the MSA in a conflict, reversing MSA 2.3. The two new obligations are a right to audit subcontractors at section 10 and a requirement to assign work product IP at section 12, where the MSA grants a licence.
The redline restores the master's position on each with the clause quoted. The liquidated damages and the IP assignment are open on the issues list for your decision, since Halden may be asking for an amendment rather than an SOW term.
Leela