Deal desks and corporate development

Keeping what is signed to what was negotiated.

The term sheet was agreed in May and the side letter arrived the week of closing. Every closing produces documents that claim to reflect what was agreed. Leela reads each one against the document that controls it, quotes both sides, and keeps every draft, side letter and turn on the round in one matter, so what is signed is what was negotiated and settled points stay settled through the closing checklist.

1

The document that controls

A side letter against the term sheet. The SPA and the IRA against the term sheet and against each other. Every provision stated as agreed, narrower, or never agreed, with the controlling text quoted.

2

The diligence bundle

Ten documents in, one memo per document and one consolidated report. The PIIA signed late, the contractor agreement with no IP assignment, found and cited.

3

Settled points stay settled

Every draft, side letter and turn on the round in one matter. The closing checklist runs from the issues list, and a change that is not marked is reported with the text quoted.

Tell us about your contracting workflow.

Request access